U.S. Nuclear Regulatory CommissionOperations Center EVENT REPORTS FOR10/21/2025 – 10/22/2025
EVENT NUMBERS 5799457996579975799057991579925799858002
Facility: Wolf Creek Region: 4 State: KS Unit: [1] [] [] RX Type: [1] W-4-LP NRC Notified By: Michael J. Payne HQ OPS Officer: Josue Ramirez
Emergency Class: Non Emergency 10 CFR Section: 50.72(b)(3)(v)(D) – Accident Mitigation
Emergency Class: Non Emergency 10 CFR Section: 50.72(b)(3)(xii) – Offsite Medical
Emergency Class: Non Emergency 10 CFR Section: 50.72(b)(2)(iv)(B) – RPS Actuation – Critical 50.72(b)(3)(iv)(A) – Valid Specif Sys Actuation
Emergency Class: Non Emergency 10 CFR Section: Agreement State
Person (Organization): Young, Matt (R1DO) NMSS_EVENTS_NOTIFICATION (EMAIL)
Emergency Class: Non Emergency 10 CFR Section: Agreement State
Emergency Class: Non Emergency 10 CFR Section: Agreement State
Person (Organization): Ziolkowski, Michael (R3DO) NMSS_EVENTS_NOTIFICATION (EMAIL)
Facility: Palisades Region: 3 State: MI Unit: [1] [] [] RX Type: [1] CE NRC Notified By: Scott Moore HQ OPS Officer: Robert A. Thompson
Emergency Class: Non Emergency 10 CFR Section: 50.72(b)(2)(xi) – Offsite Notification
Emergency Class: Non Emergency 10 CFR Section: 50.72(b)(2)(iv)(B) – RPS Actuation – Critical
BOTH TRAINS OF CONTROL ROOM EMERGENCY VENTILATION SYSTEM INOPERABLE The following is a summary of information provided by the licensee via phone and email: On October 21, 2025, at 0610 CDT, while reloading fuel to the reactor vessel, an electrical perturbation initiated a control room ventilation isolation signal (CRVIS). The control room air conditioning system (CRACS) ‘A’ train A/C unit did not start upon the CRVIS due to a blown fuse. The ‘B’ CRACS A/C unit was out of service for planned maintenance at the time. At 1020 CDT, the ‘A’ train CRACS A/C unit was returned to service. Both trains of the control room emergency ventilation system (CREVS) were inoperable for 10 minutes. Due to both trains of CRACS and CREVS being inoperable, this condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v). This condition caused entry into technical specification (TS) limiting condition for operation (LCO) 3.7.10 condition `E’ and 3.7.11 condition `D’. Upon discovery of the condition, fuel movement and core alterations were suspended in accordance with the TS LCO required actions. There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector was notified.
TRANSPORT OF CONTAMINATED PERSON OFFSITE The following information was provided by the licensee via phone and email: “On 10/21/2025 at 0930 EDT an individual fell into the reactor cavity. The reactor cavity is full of water. They ingested some amount of cavity water. The individual was decontaminated by radiation protection personnel but had 300 counts per minute detected in their hair. At 1632 EDT they were sent off site to seek medical attention. “This is an eight-hour notification, non-emergency, for the transportation of a contaminated person offsite. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xii). “The NRC Resident Inspector has been notified.”
OFFSITE NOTIFICATION The following information was provided by the licensee via phone and email: “On October 22, 2025, at 0452 EDT, chemistry determined that a report to the State of Michigan, Department of Environment, Great Lakes, and Energy, would be required based on exceeding the National Pollutant Discharge Elimination System permit limit for hydrazine. This exceedance did not exceed any NRC regulations or reporting criteria. This notification is being made solely as a four-hour, non-emergency notification for a notification to another government agency. This event is a 4-hour non-emergency report in accordance with 10 CFR 50.72(b)(2)(xi). There was no impact on the health and safety of the public or plant personnel. “The NRC Resident Inspector will be notified.”
MANUAL REACTOR SCRAM The following information was provided by the licensee via phone and email: “At 1535 CDT on 10/22/2025, with Unit 1 in mode 1 at 86 percent power, the reactor was manually tripped due to low turbine electro-hydraulic control (EHC) oil system reservoir level, caused by a leak developing in the heater bay. The trip was not complex, with all systems responding normally post-trip. Due to the reactor protection system actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B). “Operations responded using the emergency operating procedure for reactor pressure vessel control and stabilized the plant in mode 3. Decay heat is being removed by discharging steam to the main condenser using the turbine bypass valves, which have a separate EHC oil system. “There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.”
Notification Date: 10/21/2025 Notification Time: 14:37 [ET] Event Date: 10/21/2025 Event Time: 06:10 [CDT] Last Update Date: 10/21/2025
Person (Organization): Vossmar, Patricia (R4DO)
Facility: Palisades Region: 3 State: MI Unit: [1] [] [] RX Type: [1] CE NRC Notified By: Scott Moore HQ OPS Officer: Josue Ramirez
Notification Date: 10/21/2025 Notification Time: 16:52 [ET] Event Date: 10/21/2025 Event Time: 16:32 [EDT] Last Update Date: 10/21/2025
Person (Organization): Edwards, Rhex (R3DO) Grant, Jeffery (IRMOC) Phil McKenna (NRR EO)
Facility: North Anna Region: 2 State: VA Unit: [1] [] [] RX Type: [1] W-3-LP,[2] W-3-LP,[3] M-4-LP NRC Notified By: Nick Wilson HQ OPS Officer: Josue Ramirez
Notification Date: 10/21/2025 Notification Time: 23:10 [ET] Event Date: 10/21/2025 Event Time: 21:08 [EDT] Last Update Date: 10/21/2025
Person (Organization): Mckown, Louis J (R2DO)
Rep Org: Georgia Radioactive Material Pgm Licensee: Piedmont Heart Institute Region: 1 City: Douglasville State: GA County: License #: GA 1195-2 Agreement: Y Docket: NRC Notified By: Avionne Fortner HQ OPS Officer: Karen Cotton
Notification Date: 10/16/2025 Notification Time: 08:20 [ET] Event Date: 10/08/2025 Event Time: 00:00 [EDT] Last Update Date: 10/16/2025
Rep Org: NV Div of Rad Health Licensee: Universal Engineering Services Region: 4 City: Reno State: NV County: License #: 00-11-14033-01 Agreement: Y Docket: NRC Notified By: Corey Creveling HQ OPS Officer: Ian Howard
Notification Date: 10/16/2025 Notification Time: 13:51 [ET] Event Date: 10/16/2025 Event Time: 08:15 [PDT] Last Update Date: 10/16/2025
Person (Organization): Vossmar, Patricia (R4DO) NMSS_EVENTS_NOTIFICATION (EMAIL) ILTAB, (EMAIL) (EMAIL)
Rep Org: Illinois Emergency Mgmt. Agency Licensee: Elmhurst Hospital Region: 3 City: Elmhurst State: IL County: License #: IL-01612-01 Agreement: Y Docket: NRC Notified By: Kimberly Stice HQ OPS Officer: Ian Howard
Notification Date: 10/16/2025 Notification Time: 16:35 [ET] Event Date: 10/15/2025 Event Time: 00:00 [CDT] Last Update Date: 10/16/2025
Notification Date: 10/22/2025 Notification Time: 08:06 [ET] Event Date: 10/22/2025 Event Time: 04:52 [EDT] Last Update Date: 10/22/2025
Person (Organization): Edwards, Rhex (R3DO)
Facility: Clinton Region: 3 State: IL Unit: [1] [] [] RX Type: [1] GE-6 NRC Notified By: Pat Bulpitt HQ OPS Officer: Josue Ramirez
Notification Date: 10/22/2025 Notification Time: 18:57 [ET] Event Date: 10/22/2025 Event Time: 15:35 [CDT] Last Update Date: 10/22/2025
Person (Organization): Edwards, Rhex (R3DO)
Power Reactor Event Number: 57994 Facility: Wolf Creek Region: 4 State: KS Unit: [1] [] [] RX Type: [1] W-4-LP NRC Notified By: Michael J. Payne HQ OPS Officer: Josue Ramirez Notification Date: 10/21/2025 Notification Time: 14:37 [ET] Event Date: 10/21/2025 Event Time: 06:10 [CDT] Last Update Date: 10/21/2025 Emergency Class: Non Emergency 10 CFR Section: 50.72(b)(3)(v)(D) – Accident Mitigation Person (Organization): Vossmar, Patricia (R4DO)
Hello,

Welcome to the website, my cozy corner of the internet dedicated to all things homemade and found delightful to share with others online and off.
You can book with Jeffrey, Founder of xdefiance.com, by following this link here.
Visit the paid digital downloads products page to see what is all available for immediate purchase & download to your computer or cellphone by clicking this link here.
Find out more about xdefiance.com by reading the FAQ for answers to common questions. Read the Returns & Exchanges Shop Policy and if you have any questions, please contact during business hours:
Mon.-Fri. 9am-5pm, Sat. 10am-5pm Sun. Closed
You can reach someone directly at 419-318-9089 or send an email to shop@xdefiance.com for a response will be given usually within 24 hours of receiving it.
Stay updated with our latest tutorials and ideas by joining our newsletter.
Leave a Reply
You must be logged in to post a comment.